Network: Software Update of secondary network core switches
Scheduled Maintenance Report for 23M
Completed
The scheduled maintenance has been completed.
Posted Apr 18, 2024 - 22:59 UTC
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Apr 18, 2024 - 22:00 UTC
Update
Unfortunately we have to postpone the maintenance to 18.04.2024 22:00 UTC
Posted Mar 26, 2024 - 10:00 UTC
Scheduled
We will perform a software upgrade on two of our secondary core switches.
Unfortunately we are required to perform a second software upgrade to enable a line card needed for a subsequent bandwidth expansion.
If you are using internal VLANs between different racks you will notice several outages during that time frame.

External connectivity (to/from the Internet) is NOT affected.
Posted Mar 20, 2024 - 13:04 UTC
This scheduled maintenance affected: FRA01 - Telehouse (Network).