All Systems Operational
Backbone ? Operational
FRA1 - Telehouse Operational
Power Operational
Cooling Operational
Network Operational
Infrastructure Operational
FRA2 - Interxion Operational
Power Operational
Cooling Operational
Network Operational
Infrastructure Operational
FRA3 - Equinix Operational
Power Operational
Cooling Operational
Network Operational
Infrastructure Operational
FRA4 - Global Switch Operational
Power Operational
Cooling Operational
Network Operational
Infrastructure Operational
Cloud ? Operational
Operational
Degraded Performance
Partial Outage
Major Outage
Maintenance
Scheduled Maintenance
As part of our continuous maintenance activities, Global Switch data center has scheduled the following maintenance.

Rebuilding of the USV must be carried out:

During the maintenance the USV power supply is not affected.
For maintenance of the circuit breaker it is necessary to switch off a supply path for about 15 hours (28.07.2022) and the next day also for 15 hours (29.07.2022).
The supply is still guaranteed via the redundant supply path. Means that there is always an A or B supply to the rack for this 15 hours is switched off. The respective other supply path remains supplied by the UPS.

To prevent this long downtime we will power-off your server and connect it to our Automatic Transfer Switch (ATS) switch.

The maintenance is carried out from 20.07.2022. We shutdown your server at 15:00 pm- 16:00 pm (UTC+2) and plug this to the ATS switch.

Please do not hesitate to contact us if you have any questions.

Posted on Jul 4, 14:50 UTC
As part of our continuous maintenance activities, Telehouse has scheduled the following maintenance:

Maintenance of the emergency power system at Racks G & H:

During the mentioned maintenance activities the supply of UPS power to the rental areas is guaranteed. The maintenance is carried out without interruption and without influencing the security of supply.

The maintenance is carried out each day from 17.08.2022 between 7 am until 5 pm.

Please do not hesitate to contact us if you have any questions.

Posted on Jun 29, 14:06 UTC
Power: Maintenance UPS power supply at Rack G & H Sep 19, 05:00 - Sep 20, 15:00 UTC
As part of our continuous maintenance activities, Telehouse has scheduled the following maintenance:
Maintenance of the UPS FTS-3.1 (Uninterrupted Power Supply) at Rack G & H

During the maintenance the UPS power supply is not affected.
The maintenance will be without any interruption or influence with regards to the power supply.

The maintenance is carried out from 19.09. till 20.09.2022 between 7:00am till 5:00 pm

If you have any question please don’t hesitate to contact us.

Posted on Jul 6, 07:58 UTC
Past Incidents
Aug 12, 2022

No incidents reported today.

Aug 11, 2022

No incidents reported.

Aug 10, 2022

No incidents reported.

Aug 9, 2022

No incidents reported.

Aug 8, 2022
Completed - The scheduled maintenance has been completed.
Aug 8, 14:30 UTC
In progress - Scheduled maintenance is currently in progress. We will provide updates as necessary.
Aug 8, 13:30 UTC
Scheduled - We have to perform an emergency software upgrade on the switch for the secondary uplink for servers with naming HP-AUxx. You will lose the connectivity on the internal uplink for about 10-15 minutes.
Aug 8, 12:57 UTC
Aug 7, 2022

No incidents reported.

Aug 6, 2022

No incidents reported.

Aug 5, 2022

No incidents reported.

Aug 4, 2022

No incidents reported.

Aug 3, 2022

No incidents reported.

Aug 2, 2022

No incidents reported.

Aug 1, 2022

No incidents reported.

Jul 31, 2022

No incidents reported.

Jul 30, 2022

No incidents reported.

Jul 29, 2022

No incidents reported.